Friday, June 10, 2011

Lug Bracket Assembly



1. Cut 6” of 1/4” x 4” Falt Bar to make the Upper (ULBP) and Lower (LLBP) Lug Bracket Plates (2).

2. Gang Drill the Four 5/16” corner Holes in the Plates. Make sure the holes are wider than the swing arm bar.

3. Cut 4” of 1/2” x 2” Flat Bar to make the Lower Lug Bracket Tang (LLBT).

4. Chamfer the Lower corners of the tang (LLBT).

5. Drill the 3/4” axle hole in the lower end of the tang (LLBT).

6. Weld the Tang (LLBT) to the lower plate.

7. Assemble over the Lower Swing Arm Bar in the proper position. When the center of the Upper Yoke Axle Bolt is 5” from the back edge of the Hammer Swing Arm Mounting Plates. Also check to see the Hammer-Anvil Gap is about 10”.

Cut List:

ULBP. Upper Lug Bracket Plate, 1/4” x 4” x 6” Falt Bar.

LLBP. Lower Lug Bracket Plate, 1/4” x 4” x 6” Falt Bar.

LLBT. Lower Lug Bracket Tang, 1/2” x 2” x 4” Flat Bar.

LBHB Lug Bracket Hex Bolts, 5/16” x 1.5”, (4).

LBHN. Lug Bracket Nylox Hex Nuts, 5/16”, (4).

No comments:

Post a Comment