Wednesday, May 18, 2011

Frame - Part 2:




Heavy Frame Reinforcements:

I waited until working with the frame moved to the floor to add the top plate and the top corner straps as well as the vertical side flange bolsters, reservoir support bracket, reservoir bolting tabs, control valve mounting flange and Square D switch box. If I had a heavy duty overhead hoist I could have done all that comfortably on the table.

No comments:

Post a Comment